The Designer clicks the notification to enter into the activity. After entering the activity the Designer needs to click on Files tab. Under Actions click on the three straight line. Click on Update icon and upload the Updated Version of the file from the desktop as shown below. There are three buttons available under Actions. Refer the image shown below.
After uploading the Updated Version of the file successfully, the Updated Version Number of the file changes from 0.1 to 0.2. Refer the image shown below.
Powered by ManageArtworks